The flat vulcanizer is equipped with an electrical control box for operating the motor to run, stop and control the heating system. The joystick on the control valve controls the flow direction of the pressurized oil. Before the equipment is used, the filtered pure oil should be injected into the oil storage tank. There is an oil injection hole on the oil tank, and the oil injection height should be injected according to the height of the oil mark.
Before the normal use of the flat vulcanizing machine, it must be tested by idling. Before the test, first check whether the connecting parts are loose and whether the pipelines are firm. The specific requirements for the test run are as follows:
1. Pull down the control handle of the control valve, open the control valve, start the oil pump, and let the oil pump run idle for 10 minutes.
2. Pull the handle up, close the control valve, let the hydraulic oil with a certain pressure enter the oil cylinder, and make the plunger rise until the hot plate is closed.
3. Qingdao Beishun Environmental Protection Co., Ltd. stated that the number of times of closing the hot plate in the dry running test run should not be less than 5 times, and the machine can be put into normal use only after confirming that the machine meets the design requirements.
Of course, we also need to test the car on site when it is delivered to the customer, and record the video to keep it, which can not only tell the customer how to check and use it, but also inform the common mistakes, which greatly improves the production efficiency.