Rubber Vulcanizing Press Machine maintenance time, when to change the oil?

May 26, 2022

Leave a message

Maintenance time of Rubber Vulcanizing Press Machine, vulcanizer needs daily maintenance and periodic maintenance. The Rubber Vulcanizing Press Machine needs to be changed after running for a period of time. The oil change depends on the degree of contamination of the oil. However, how to control the oil change time is also a problem. In view of the problem of when to change the oil of the Rubber Vulcanizing Press Machine, some methods are drawn:

1. Visually inspect the oil change method. It is based on the experience of the maintenance personnel, and according to some visual changes in the normal state of the oil - such as the oil turning black, smelly, turning milky white, etc., to decide whether to change the oil. This method depends on the accumulated experience of the actual operator.

2. Sampling test method. Regularly sample and test the oil in the vulcanizer. The measured items (such as viscosity, acid value, moisture, particle size and content, and corrosion, etc.) and indicators are based on the actual measured value of oil quality and the specified oil deterioration standard. Make a comparison to determine whether the oil should be changed. Sampling time: The hydraulic system of general construction machinery should be carried out one week before the oil change period. The hydraulic system of key equipment, such as: full-section roadheader, should be sampled and tested every 500 hours, and the test results should be filled in the equipment technical file . The sampling test method is suitable for key equipment and large hydraulic equipment.

3. Regular oil change method. According to the environmental conditions and working conditions of the site where the equipment is located, and the oil change cycle of the oil used, it will be replaced when it is due. This method is very suitable for enterprises with more hydraulic equipment.


Send Inquiry
Send Inquiry